Opens in a new tab

Help with AS/NZS 5131 requirements

Has a customer or contract asked you to meet AS/NZS 5131 requirements? PWC helps fabricators Australia-wide with structural steelwork compliance across construction categories CC1 to CC4. Send us the request so we can discuss the support you need.

Worker in leather gloves using an angle grinder on steel, with sparks flying

What is AS/NZS 5131?

AS/NZS 5131 covers the fabrication and erection of structural steelwork in Australia and New Zealand. PWC supports compliance across construction categories CC1 to CC4.

Meeting AS/NZS 5131 can help:

  • give greater certainty of the construction outcome
  • reduce the incidence of non-conforming supply
  • minimise rework and repair over the life of the project
  • reduce risk, consistent with the intent of Work Health and Safety legislation
Black and white aerial photo of a city with rail yards and steel structures

What the construction categories mean

A construction category (CC) sets the level of control and evidence needed when structural steelwork is fabricated and erected. There are four, from CC1 to CC4. The higher the category, the more documented assurance the job needs.

The designer assigns the category based on the project and its requirements. It isn’t a rating the fabricator chooses. You’ll usually find it in the project specification or on the drawings.

  • CC1 applies to simpler, lower-consequence work.
  • CC2 applies to many conventional building projects.
  • CC3 is used for higher-consequence or more complex work, and generally calls for stronger documented welding controls and evidence of competence.
  • CC4 covers the most demanding structures, where failure would have extreme consequences.

Start with what your customer needs

Share the relevant part of the tender, contract or customer request. Include your deadline and any records you already have.

Build on what is already in place

The starting point is your current work and records. From there, we can discuss the gaps, the help needed and the tasks your business will handle.

Confirm the category

We check which construction category (CC1 to CC4) your contract names and what it requires of your business.

Review

We review your project requirements, fabrication records and inspection plans, and explain which parts need more work.

Documentation

We help prepare the agreed documents and explain to your staff which records they will use and who keeps them up to date.

How a typical CC2 job runs

First, confirm the construction category, scope, drawings, project specification and inspection requirements. Then review the materials, welding requirements, hold and witness points, and any NDT that’s required.

Before fabrication starts, prepare the project quality documents the contract asks for. These may include an inspection and test plan (ITP), a welding plan, approved welding procedures (WPSs), welder qualification records and controls for buying materials.

During the job, identify and check materials, record fabrication and welding inspections, complete the specified testing and manage any nonconformances. At the end, put together the handover records, such as material certificates, weld and inspection records, NDT reports and as-built information.

The exact requirements depend on the project documents.

What changes for CC3

The order of work is much the same: review the requirements, plan buying and fabrication, control welding and inspection, then compile the handover records. What changes is the level of documented assurance.

For CC3 this can mean more formal welding quality management, stronger evidence that welding coordination is done by competent people, and more detailed traceability and inspection records. The project specification sets the welding, testing and acceptance requirements, so don’t assume the amount of NDT from the category alone.

AS/NZS 5131 generally recommends ISO 3834 Part 2 for CC3 welding quality requirements. Whether the fabricator needs independent certification depends on the contract and the project specification. If it does, see our ISO 3834 page.

Related services

Most AS/NZS 5131 jobs also need qualified welding procedures, welder qualification records and often a weld map. We can handle these as part of the same job.

Be clear about the work and the certificate

Before starting, agree on who does each task and what documents will be delivered. If certification is required, the organisation responsible for assessing and issuing it must also be clear.

Know who does each part

PWC prepares your business and documents compliance. An independent accredited certification body carries out the external audit and issues the certificate.

Your business puts the agreed processes into practice and keeps the records. Our quote explains our role and any work or fees handled separately.

Experience with similar requirements

PWC has provided ISO 3834-2, AS/NZS 5131 and TfNSW compliance consultancy, along with welding coordination, for fabricators across Australia. We can share examples of similar work when we discuss your job.

Common questions

Send us the requirement you received

Tell us about your business, the work involved and the date you need to meet.